Hard data, straight from the shop floor.
Every number below represents a real manufacturing plant that changed its benefits package — and changed its hiring trajectory.
Benefits over base pay
of skilled tradespeople say benefits quality matters more than hourly rate when choosing an employer.
Avg. CNC operator vacancy
The average time-to-fill for a skilled machinist position at plants with generic benefits packages.
Annual turnover from confusion
Manufacturers lose 11% of their workforce annually due to benefits plans employees cannot understand or use.
Better 3-year retention
Plants with apprenticeship tuition reimbursement keep employees 41% longer than plants without it.
Average annual savings
What Enroll clients save per year in reduced turnover costs, optimized premiums, and better plan utilization.
Faster time-to-fill
Enroll clients fill skilled trades positions 2.3× faster than industry average after benefits optimization.
Generic broker plan vs. Manufacturing-optimized.
Row by row, here's what your machinists actually need — and what a generic plan leaves out.
10 of 10 features favor the manufacturing-optimized plan.
Audit Your Benefits PackageThe data becomes undeniable momentum.
Every metric below widens the gap between plants that optimized their benefits and those still running a generic broker package.
The plant down the road already knows this.
Your competitors are already running manufacturing-optimized benefits packages. Every month you wait, another machinist reads their offer letter and signs it.
Ready to stop losing machinists over a dental plan?
Request a full benefits audit — or grab the free benchmark report to see where you stand first.
Audit Your Benefits Package
Free, no obligation — we'll call you within 1 business day
Manufacturing Benefits Benchmark Report
Free download — just your email
- 2026 benchmark data for 400+ U.S. manufacturers
- Plan-by-plan comparison across 12 benefit categories
- Shift-worker specific coverage gaps most brokers miss
- Retention ROI calculator (fill in your own numbers)
Donna Ramirez
HR Director — Kestrel Fabrication, Rockford IL
"We were losing two welders a month. Enroll audited our package and found seven gaps in six hours. Within 90 days our time-to-fill dropped from 11 weeks to 4."
Time-to-fill
Turnover savings, yr 1